无锡市梁溪区第二水厂扩建工程初步设计(12万吨/日)文献综述
2022-07-27 14:49:34
无锡市梁溪区第二水厂扩建工程初步设计
[摘要]:无锡市梁溪区第二水厂扩建工程初步设计,设计规模为:120000 m 3 / d ,要求根据所给资料进行给水工艺设计和单体构筑物设计计算,包括取水输水构筑物设计、输配水管网设计、净水 厂设计、工程概算和制水成本计算。
净水厂采用工艺流程为:水源,一级泵房,配水井,消毒剂,机械搅拌澄清池,V 型滤池,清水池, 吸水井,二级泵房,配水管网,用户
[关键词]:给水工程;取水输水构筑物;净水厂;输配水管网。
Abstract:The preliminary design of the second beam Creek area water plant expansion project in Wuxi City, the scale of the design for the 120000 M / 3 D, according to the information required for the design calculation of water supply process design and monomer building, including water conveyance structures design, pipeline network design, the design of the water purification plant, engineering budget and water cost calculation.
coagulation Water Resiyrce — primary water pumping station — assigned wells — disinfection mechanical agitation clarifiers —V-filter — storage pool — water well — secondary water pumping station — urban pipe network —system -users
Keywords: Water supply engineering; Water intake structures; Waterworks; Water Distribution net.
水是人类赖以生存和从事生产不可缺少的资源。随着人口增长、经济发展及人类生活水平的提高,人类对水的需求日益增长。水资源又是一种有限的,而且是不可取代的宝贵资源。全球广义水资源总量约为140亿m3;其中除去海水、冰川、深层高矿化地下水外,可开发利用的且逐年更新的淡水(即狭义的水资源),其总量为47万亿m3,仅占水资源总量的0.03%,而在一定技术条件下可以为人类取用的水量则更少。因此,联合国报告预测,21世纪淡水将成为全世界最紧缺的自然资源。迄今为止,有不少国家和地区的水资源问题已成为国民经济发展的制约因素。
给水系统是由相互联系的一系列构筑物和输配水管网组成。它的任务是从水源取水,按照用户对水质的要求进行处理,然后将水输送到用户区,并向用户配水。
课题毕业论文、开题报告、任务书、外文翻译、程序设计、图纸设计等资料可联系客服协助查找。